| PP Transaction Codes | ||
| MATERIAL | ||
| CREATE-GENERAL | MM01 | IMMEDIETELY |
| MM11 | SCHEDULE | |
| CHANGE | MM02 | IMMEDIETELY |
| MM12 | SCHEDULE | |
| MM13 | ACTIVATE | |
| FLAG FOR DELETION | MM06 | IMMEDIETELY |
| MM16 | SCHEDULE | |
| DISPLAY | MM03 | DISPLAY CURRENT |
| MM19 | DISPLAY AT KEY DATE | |
| DISPLAY CHANGES | MM04 | ACTIVE CHANGES |
| MM14 | SCHEDULE CHANGES | |
| MM17 | MASS MAINTENANCE | |
| MMAM | CHANGE MATERIAL TYPE | |
| OTHER | MMBE | STOCK OVERVIEW |
| MMPV | CLOSE PERIOD | |
| MMRV | ALLOW POSTING TO | |
| PREVIOUS PERIOD | ||
| MM50 | INSTANT MATERIAL VIEW | |
| MMSC | ENTER STORAGE LOCATIONS | |
| MM60 | MATERIAL LIST | |
| ARCHIVING(MATERIAL) | MM71 | ARCHIVE/DELETE |
| MM72 | DISPLAY ARCHIVE | |
| BILL OF MATERIAL (MATERIAL BOM) | ||
| CS01 | CREATE | |
| CS02 | CHANGE | |
| CS03 | DISPLAY | |
| EXTRAS | CS28 | ARCHIVING |
| CS20 | MASS CHANGES | |
| EVALUATION/BOM | CS11 | BOM MULTILEVEL |
| EXPLOSION/MATERIAL | CS12 | STRUCTURE MULTILEVEL |
| BOM | CS13 | SUMMURISED BOM |
| WORK CENTRES | ||
| CR01 | CREATE | |
| CR02 | CHANGE | |
| CR03 | DISPLAY | |
| CA85 | REPLACE | |
| CAPACITY | CR11 | CREATE |
| CR12 | CHANGE | |
| CR13 | DISPLAY | |
| HIERARCHY | CR21 | CREATE |
| CR22 | CHANGE | |
| CR23 | DISPLAY | |
| LINE HIERARCHY | LDB1 | CREATE |
| LDB2 | CHANGE | |
| LDB3 | DISPLAY | |
| REPORTING | CR60 | W/C INFORMATION SYSTEM |
| CR05 | W/C LIST | |
| CR06 | COST CENTRE ASSIGNMENT | |
| CR07 | W/C CAPACITIES | |
| CR08 | W/C HIERARCHY | |
| WHERE USED | CA80 | WORK CENTRE |
| CR15 | CAPACITY | |
| CR10 | CHANGE DOCUMENTS | |
| EXTRAS | CR09 | STD. TEXTS TASK LIST |
| CR41 | ARCHIVING | |
| ROUTING | ||
| STAD. ROUTING | CA01 | CREATE |
| CA02 | CHANGE | |
| CA03 | DISPLAY | |
| REF. OPERATION SETS | CA11 | CREATE |
| CA12 | CHANGE | |
| CA13 | DISPLAY | |
| RATE ROUTING | CA21 | CREATE |
| CA22 | CHANGE | |
| CA23 | DISPLAY | |
| REF. RATE ROUTING | CA31 | CREATE |
| CA32 | CHANGE | |
| CA33 | DISPLAY | |
| EXTRAS | CA85 | REPLACE W/C |
| MASS CHANGES | CA95 | REPLACE REF. OP. SET |
| CA75 | REPLACE PRT | |
| DELETE TASK LIST | CA99 | WITH ARCHIVING |
| CA98 | W/O ARCHIVING | |
| REPORTING | CA80 | WORK CENTRE |
| WHERE USED LIST | CA90 | REF. OP. SETS |
| CA70 | PRODUCTION RESORCE TOOLS | |
| COST CENTRE | ||
| OKKP | MAINTAIN CONTROLLING AREA | |
| KS01 | CREATE COST CENTRE | |
| KZS2 | CREATE COSTING SHEET | |
| KA01 | CREATE PRI. COST ELEMENT | |
| KA06 | CREATE SEC. COST ELEMENT | |
| KL01 | CREATE ACTIVITY TYPE | |
| KP26 | ACTIVITY TYPE/PRICE PLANNING | |
| SALES AND OPERATIONS PLANNING | ||
| PRODUCT GROUP | MC84 | CREATE |
| MC86 | CHANGE | |
| MC85 | DISPLAY | |
| GRAPHIC | MC91 | PRODUCT GROUP |
| MC92 | OVERVIEW | |
| PLANNING | MC81 | CREATE |
| FOR PRODUCT GROUP | MC82 | CHANGE |
| MC83 | DISPLAY | |
| MC75 | TRANSFER PG TO PLANNING | |
| FOR MATERIAL | MC87 | CREATE |
| MC88 | CHANGE | |
| MC89 | DISPLAY | |
| MC74 | TRANSFER MATERIALS TO | |
| MC9K | MATERIAL AVAILABILITY | |
| VERSION MANAGEMENT | MC78 | COPY |
| MC80 | DELETE | |
| FLEXIBLE PLANNING | MC93 | CREATE |
| PLANNING | MC94 | CHANGE |
| MC95 | DISPLAY | |
| MC9K | MATERIAL AVAILABILITY | |
| TOOLS/PLANNING TYPE | MC8A | CREATE |
| MACRO | MC8B | CHANGE |
| MC8C | DISPLAY | |
| EVENT | MC64 | CREATE |
| MC65 | CHANGE | |
| MC66 | DISPLAY | |
| ROUGH CUT PLANNING | MC35 | CREATE |
| PROFILE | MC36 | CHANGE |
| MC37 | DISPLAY | |
| ENVIRONMENT | MC90 | TRANSFER MATERIALS TO DM |
| ACTIVITY REQT. | KSPP | TRANSFER TO COST CENTRE |
| KSBL | COST CENTRE PLANNING REPORT | |
| KSOP | TRANSFER TO ACTIVITY BASED COSTING | |
| CPBL | PLANNING REPORT PROCESSES | |
| MC9C | REPORTING | |
| SETTINGS | MC96 | FORECAST PROFILE |
| DISSAGGRIGATION | MC76 | BREAKDOWN PG PLAN |
| MC77 | DISPLAY PG PLAN | |
| MC75 | TRANSFER PG TO PLANNING | |
| MC74 | TRANSFER MATERIALS TO DM | |
| FORECASTING | ||
| INDIVIDUAL FORECAST | MP30 | EXECUTE |
| MP31 | CHANGE | |
| MP32 | DISPLAY | |
| TOTAL FORECAST | MP38 | EXECUTE |
| MP33 | REPROCESS | |
| MP39 | ||
| MPBT | EXECUTE BACKGROUND | |
| MPDR | PRINT BACKGROUND | |
| DEMAND MANAGEMENT | ||
| PIR | MD61 | CREATE |
| MD62 | CHANGE | |
| MD63 | DISPLAY | |
| MD65 | REQTS. FOR SCINARIO | |
| MD66 | COPY SIMULATED DEPENDENT REQT. | |
| MD70 | COPY TOTAL FORE CAST | |
| EVALUATION | MD73 | DISPLAY TOTAL REQT. |
| MD79 | EXCELL INTERFACE | |
| MD4C | ORDER REPORT | |
| MD72 | CHARECTERISTICS PLANNING | |
| CUSTOMER REQT. | MD81 | CREATE |
| MD82 | CHANGE | |
| MD83 | DISPLAY | |
| REPETITIVE MANUFACTURING | ||
| MASTER DATA | C223 | PRODUCTION VERTION |
| PRODUCT COST PLANNING | ||
| COSTING RUN | CKMATSEL | CREATE |
| SELECTION LIST | CKMATCON | Edit |
| CK40N | EDIT COSTING RUN | |
| Master Data | MD25 | Create planning calendar |
| MD26 | Change planning calendar | |
| MD27 | Display planning calendar | |
| MDSA | Display BOM explosion number | |
| MDSP | Edit BOM explosion number | |
| MEQ1 | Maintain quota file | |
| OPPP | Explode BOM by date | |
| MDUS | Display project assignment | |
| MDUP | Process project assignment | |
| MDL1 | Create production lot | |
| MDL2 | Change production lot | |
| MDL3 | Display production lot | |
| Planning | MD20 | Create planning file entry |
| MD21 | Display planning file entry | |
| MDAB | Set up planning file entry in background | |
| MDRE | Check planning file entry | |
| MD01 | Total planning online | |
| MDBT | Total planning in background | |
| MD03 | Single-item, single-level planning | |
| MD02 | Single-item, multi-level planning | |
| MD43 | Interactive single-item planning | |
| MD50 | Multi-level, make-to-order planning | |
| MD51 | Multi-level project planning | |
| MF52 | Display planning table | |
| MF50 | Change planning table | |
| MF57 | Planning table by MRP lists | |
| MF51 | Planning table by production list | |
| Evaluations | MD04 | Stock/requirements list |
| MD07 | Collective access of stock/requirements lis | |
| MD05 | MRP list | |
| MD06 | Collective access of MRP lists | |
| MDLD | Print MRP list | |
| MD45 | Planning result | |
| MD46 | Collective access of planning result | |
| MD44 | Planning situation for a material | |
| MD47 | Planning situation for a product group | |
| MD48 | Cross-plant planning situation | |
| MD4C | Order report | |
| MD09 | Pegged requirements | |
| CO46 | Order progress | |
| Planned Order | MD11 | Create planned order |
| MD12 | Change planned order | |
| MD13 | Individual access of planned order | |
| MD16 | Collective access of planned orders | |
| MD14 | Individual conversion of planned order into | |
| MD15 | Collective conversion of planned orders int | |
| MDUM | Convert planned order into purchase requisi | |
| CO40 | Convert individual planned order into produ | |
| CO41 | Collective conversion of planned orders int | |
| CO48 | Partial conversion of planned order into pr | |
| COR7 | Individual conversion of planned order into | |
| COR7_PC | Collective conversion of planned orders int | |
| COR8 | Partial conversion of planned order into pr | |
| MDVP | Collective availability check | |
| MDAC | Execute action for planned order | |
| LONG TERM PLANNING | ||
| PALNNING SCENARIO | MS31 | CREATE |
| MS32 | CHANGE | |
| MS33 | DISPLAY | |
| PLANNING RUN | MS01 | ON LINE |
| MSBT | SA BACKGROUND JOB | |
| MS02 | SINGLE ITEM - MULTI LEVEL | |
| MS03 | SINGLE ITEM - SINGLE LEVEL | |
| MS50 | SINGLE ITEM - SALES ORDER | |
| MS51 | SINGLE ITEM PLANNING, PROJECT | |
| MFSO | PLANNING TABLE | |
| EVALUTIONS | MS05 | MRP LIST MATERIAL |
| MS06 | MRP LIST COLLECTIVE DISPLAY | |
| MSLD | PRINT MRP LIST | |
| MS04 | STOCK/REQUIREMENTS LIST | |
| MS07 | STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY | |
| MS44 | PLANNING SITUATION MATERIAL | |
| MS47 | SITUATION PRODUCT GROUP | |
| MPS-MASTER SCHEDULE | ITEMS | |
| TOTAL PLANNING | MD40 | ON LINE |
| MDBS | SA BACKGROUND JOB | |
| MD41 | SINGLE ITEM - MULTI LEVEL | |
| MD42 | SINGLE ITEM - SINGLE LEVEL | |
| MD43 | SINGLE ITEM - INTERACTIVE | |
| MD50 | SINGLE ITEM - SALES ORDER | |
| MD51 | SINGLE ITEM PLANNING, PROJECT | |
| *** EVALUTION IS SIMILAR TO MRP | ||
| PRODUCTION CONTROL | ||
| ORDER - CREATE | CO01 | WITH MATERIAL |
| CO07 | WITHOUT MATERIAL | |
| CO40 | FROM PLANNED ORDER | |
| CO41 | COLLECTIVE CONVERTION OF PLANNED ORDER | |
| CO08 | FOR SALES ORDER | |
| CO10 | FOR PROJECT | |
| CO02 | CHANGE | |
| CO03 | DISPLAY | |
| CONTROL | MD04 | STOCK/REQUIREMENTS LIST |
| COHV | MASS PROCESSING | |
| COMAC | COLLECTIVE AVAILABILITY CHECK | |
| CO05N | COLLECTIVE RELEASE | |
| CO04N | ||
| CO09 | AVAILABILITY OVER VIEW | |
| GOODS MOVEMENT | MF65 | STOCK TRANSFER FOR RESERVATION |
| MATERIAL STAGING | MF68 | LOG |
| MB1A | GOODS ISSUE | |
| MB31 | GOODS RECEIPT | |
| COWBPACK | PACK MATERIAL | |
| CONFIRMATION | CO1V | TIME TICKET |
| FOR OPERATION | CO14 | DISPLAY |
| CO13 | CANCEL | |
| CO1L | REQUESTED CONFIRMATIONS | |
| CO1P | PREDEFINED PROCESSES | |
| TOOLS-ARCHIVING | CO78 | ORDER |
| KOAA | SETTELMENT DOCUMENTS | |
| CAPACITY PLANNING | ||
| EVALUTION | CM01 | LOAD |
| WORK CENTER VIEW | CM02 | ORDERS |
| CM03 | POOL | |
| CM04 | BACKLOG | |
| CM05 | OVERLOAD | |
| CM07 | VARIABLE | |
| EXTENDED EVALUTION | CM50 | WORK CENTER VIEW |
| CM51 | INDIVIDUAL CAPACITY VIEW | |
| CM52 | ORDER VIEW | |
| LEVELLING | CM21 | PLANNING TABLE (GRAPHICAL) |
| WORK CENTER VIEW | CM22 | PLANNING TABLE (TABULAR) |
| INDIVIDUAL CAPACITY | VCM27 | PLANNING TABLE (GRAPHICAL) |
| CM28 | PLANNING TABLE (TABULAR) | |
| ORDER VIEW | CM31 | PLANNING TABLE (GRAPHICAL) |
| CM32 | PLANNING TABLE (TABULAR) | |
| AVAILABLE CAPACITY | CR12 | CHANGE |
| CAPACITY | CR13 | DISPLAY |
| OP4A | SHIFT SEQUENCE | |
| OP43 | FACTORY CALENDER | |